Project 

After being recommended by others, ABS Ltd were asked to heat a new gymnasium facility in Gloucester.

The first design was for 4 x 15kw Radiant Tubes, but after consultation it was decided that we would heat the premises with a Reznor Warm Air heater, complete with 4 x stratification fans spaced at regular intervals down the length of the hall.

The fans will recirculate the warm air which sits in the roof of the building. This provides an even tempearture throughout the building and is a cost effective solution.

The system is controlled by a Smartcom controller with an air sensor – once the gas was reinstated to the site a new meter was fitted and the install completed.