Lockdown 2020, Part Three
Project: Mole Valley, Wickham

ABS had to replace the combustion chamber at the Mole Valley in Wickham.

The heater was stripped down and disconnected. Then the chamber was removed and replaced with new. It was left in full working order, providing a comfortable heated environment for the employees and customers in Wickham.

Project: Mole Valley, Frome

Mole Valley Frome was also in need of a chamber replacement, however, these parts were obsolete.

Due to this, ABS supplied and installed 2 x new Powrmatic suspended NVX heaters as a replacement. This would aid heat distribution and reduce the running costs for this store.

The existing heater was left in position with the gas isolated, but still electrically connected, to provide fresh air during the summer months.