Installation News July 2016
St Mary's Church, Donhead St Mary
ABS in conjunction with Nordair Niche replaced the old AHU with a new 130kw Nordair Niche unit, The unit is powered by LPG and has a new trend control panel and was connected to existing ducting which runs from outside to inside the Church. The unit was re-supported with new steelwork, a new transition piece and insulation. The unit was converted from 3 phase to 1 phase electrical as the Church only had 1 phase available. The heater was comissioned with the help of Nortek due to the trend system.
Bury Developments (Suffolk)
ABS along with Bury Developments supplied and installed warm air heating, manufactured by Powrmatic. The heaters have been installed in various locations throughout the factory - along with a natural gas pipework.
Tate Technical (Effingham)
ABS along with Tate Technical and Thermal Energy installed 24 x Blackheat 30kw Radiant U Tubes on a 2 Burner Herringbone configuration at the Rail Shed for Network Rail/Osborne in Effingham. The sytem was installed after the roof at the shed was removed and new roof and steel work was installed. The gas pipework was installed above the steelwork and in stainles steel pressfit.
Also.....
Screwfix Whitsable - 1 x Radiant U Tube
Screwfix Wolverhampton - 1 x Radiant U Tube
Screwfix Faringdon - 1 x AC System
Mole Valley Devizes - 1 x NVX Warm Air
Service Department (July 2016)
Some of the service contracts we have been awarded this month inlcude;
- Comissioning of Benson Warm Air Heater installed at NRS Graphics, Bristol
- Service of a quantity of Blackheat BH30 Radaint Heaters, Wanson Warm Air Heaters and Combat Warm Air Heaters installed at Laurence Scott, Norwich
- Annual service of Ambi Rad HEaters at Ransoms Garden Centre, Jersey
- Comissioning of Space Ray SRU25 radiant heater installed at Hawley Garden Centre, Dartford